A reference from uviblox GmbH. More references from uviblox GmbH

Construction and groundwater treatment during soil remediation

Lehrter Street in Berlin, Germany

Treated media: Soil, Groundwater

Flow rate: 10 m3/h

Substances: BTEX, MOH, PAH, Phenols

Processes: Activated Carbon, Gravel filtration, Coalescence separation, Sedimentation

Commissioning: 2019

KF Company: Harbauer Berlin GmbH

723463 Lehrter Str

The water flow rate from the two hydraulic safety wells is about 6m3/h. In addition, during the construction phase, the process water (charging water and water from the drainage of the lid containers) is added at about 2m3/h.

The construction and well water first enters a large 40m3 settling tank for the separation of light and heavy materials as well as for the sedimentation of sand fractions. After that, the process water enters a phase separator with a coalescence stage. In order to protect the subsequent cleaning stages, the mixed water then passes from the buffer tank via a pressure increase stage into a gravel filter for the separation of fine grain components. To remove the organic pollutants, a 2-stage activated carbon filtration (working and police filters) is carried out. The cleaning system and all lines are designed to be winter-safe.

In addition, a fully automatic PLC control (GSM) with internal operation monitoring and visualization has been installed.

Download this reference as PDF
Contact person at Harbauer Berlin GmbH

Do you have any questions about our services. Then we look forward to your contact request!

Frank Segbert
Project Manager